BD15 St. Ulrich - Seiseralm
By bicable gondola lift to the Alpe di Siusi

BD15 St. Ulrich - Seiseralm

The 2S gondola lift was installed in 1999 and replaced two aerial tramways. It was a good alternative to the aerial tramways for the hill with a gradient of 70%. Only two pylons were required. Leitner installed one of its own proven gearbox systems. Leitner was at that time the only company worldwide that produced its own gearboxes. The ropeway to the Alpe di Siusi was the most modern ropeway in Italy in 1999.

Company: St. Ulrich-Seiseralm AG
Location: Ortisei / St. Ulrich (BZ)
Country: Italy
Year: 1999
Type of ropeway:
Length in m
1861
Height difference
775
p/hr.
2400
kW
600
Number of cabins
35
Number of towers
2
Newsletter subscription

The top stories about our projects and products. Register now!