Blondin - Alto Tamega

Blondin - Alto Tamega

Two cablecranes for the construction of the 106m-long double-curvature concrete dam with an height of 334m.
Mota Engil – Acciona – Edivisa, ACE appointed Agudio for a complete refurbishment, installation and commissioning of two parallel cablecranes, trusting in the reliability and performances of Agudio equipment. 

Company: Mota Engil - Acciona - Edivisa - ACE
Location: Parada
Country: Portugal
Year: 2019
Type of ropeway:
Capacity ton/h
28
Span in m
620
Translation speed in m/s
6
Hoisting speed in m/s
2,5
Vertical hook rise in m
200