CD6 Tschein
Modernization at Carezza (I)

CD6 Tschein

The 6-passenger “Tschein” chairlift replaces an old 3-passenger chairlift and provides a much better connection between the Moseralm and the Tschein Mountain. The 2-kilometer trip takes just six minutes. Yet that is not the only advantage. As the new lift is 710 meters longer and the top station is now 80 meters higher, some new descents below the Rifugio Fronza hut are now open to passengers. This lift is fitted with the exclusive DirectDrive system from LEITNER ropeways.

Company: Latemar Karersee GmbH
Location: Welschnofen/Nova Levante (BZ)
Country: Italy
Year: 2014
Type of ropeway:
Length in m
1885
Height difference
378
p/hr.
2000
kW
441
Number of seats
74
Number of towers
16
Newsletter subscription

The top stories about our projects and products. Register now!