GD10 Piz Seteur II
A world first in Val Gardena

GD10 Piz Seteur II

At the foot of the Sassolungo, LEITNER ropeways built one of the major highlights of the 2017/2018 winter season: the new Piz Seteur gondola lift consists of two sections and sets new standards in comfort, safety and performance. The Symphony 10 cabin, premiered in Val Gardena, offers far more space and a larger entrance area for passengers. The unmistakable Pininfarina design rounds off the package. The extended boarding time in the station (65 seconds), with six opened cabins, give winter sports enthusiasts more time for safe and stress-free embarking and disembarking. The new intermediate station was also designed by Pininfarina, and offers great benefits thanks to a perfect combination of state-of-the-art Pininfarina design and sophisticated construction. Of course, it also increases passenger comfort.

Company: Piz de Sella S.p.A.
Location: Wolkenstein / Selva Gardena (BZ)
Country: Italy
Year: 2017
Type of ropeway:
Length in m
486
Height difference
104
p/hr.
3600
kW
353
Number of cabins
30
Number of towers
6
youtube video
Newsletter subscription

The top stories about our projects and products. Register now!