Major overhauling of the existing ropeway in operation in Campulung cement plant to bring the material downhill from the quarry to the cement plant on a straight way. The intervention included the full replacement of the electromechanical system (to be installed in the existing, unmodified, stations) and the full automation and synchronization of the ropeway.