TMX 6-8 Laner

TMX 6-8 Laner

A modern Telemix system replaced the previous fixed 4-seater “Laner” chairlift in time for the start of the 2016/17 winter season. Equipped with 6-seater chairs and 8-passenger cabins, it doesn’t just improve transport services. It also offers far greater functionality. Parallel to the new facility, a 750-meter-long toboggan run was installed, meaning tobogganists are able to reach their destination easily with the flexible and spacious ropeway. As another bonus, the new installations provide a far more convenient and efficient link to the Pampeago ski resort.

Company: Obereggen AG
Location: Obereggen
Country: Italy
Year: 2016
Type of ropeway:
Length in m
465
Height difference
98
p/hr.
3000
kW
440
Number of towers
4

Testimonial

The new toboggan run, following the sunny Laner training slope directly from the top station to the valley station, increased our requirements for the new ropeway. On one hand, we wanted to transport both ski instructors with groups of small children and tobogganists with spacious and comfortable gondolas, but we also wanted to offer skiers a modern 6-seater chairlift. That is why we considered a new Telemix system with spacious gondolas, and we are very happy to have chosen a Leitner system again after over 30 years.

- Georg Weissensteiner - Präsident Obereggen AG
Newsletter subscription

The top stories about our projects and products. Register now!