Search term
949 results:
661.
Blondin - Alto Tamega

Two cablecranes for the construction of the 106m-long double-curvature concrete dam with an height of 334m. Mota Engil – Acciona – Edivisa, ACE appointed Agudio for a…
662.
Flying Belt - Cravasco

This Flyingbelt will be used to move spoils from tunneling operation to the disposal site simply crossing a valley without any supporting steel structure. The…
663.
Blondin - Daivoes

Ferrovial / MSF Barragens, ACE appointed Agudio for the complete refurbishment, installation and commissioning of two radial cablecranes, trusting in the reliability and…
664.
SL1 Stöten Lilla

665.
SL1 Pradibosco

666.
SL1 Valloncello

667.
CF4 Nuova Tarvisio

668.
CD6 Muntele Mic

669.
CD6 Fontari

670.
GD10 Jennerbahn I+II

The “Jennerbahn I + II” 10-passenger gondola lifts and the “Jennerwiesen” 6-seater chairlift have been built in the well-known Mount Jenner area at Königssee lake. The…
Search results 661 until 670 of 949
Newsletter subscription

The top stories about our projects and products. Register now!