New ropeways on Ochsenkopf and Hauser Kaibling

LEITNER sets standards in technology and sustainability

Just in time for the start of the 2024/2025 winter season, we are presenting two impressive projects in Bavaria (Germany) and Styria (Austria): The new ropeway systems on the Ochsenkopf in the Fichtelgebirge and on the Hauser Kaibling in the Schladming-Dachstein ski region combine state-of-the-art technology, maximum comfort and sustainability.

GD10 “Ochsenkopf Süd” – Future technology in the Fichtelgebirge

  • Modernization completed: After the construction of the 10-seater “Ochsenkopf Nord” gondola lift in 2023, the access from the south side of the mountain has now followed
  • Efficient & environmentally friendly:
    • LEITNER DirectDrive for low-maintenance and resource-saving operation
    • PV panels with 200 kWp make the system energy-self-sufficient in sunlight
  • Technical highlights:
    • Speed: 6 m/s
    • 21 cabins transport up to 1,200 people per hour
    • Adaptations for summer use with innovative LEITNER bike racks
  • Comfort for all: Special solutions for monoskiers and optimized stations with social rooms and garage facilities.

CD8C Kaiblinggrat – generational change in Styria

  • Higher capacity: With up to 3,600 people per hour, the new chairlift currently has the highest performance in Styria
  • New standard:
    • LEITNER Premium Chair EVO with a bubble and individual footrests
    • Conveyor belt with lifting table for safe entry, especially for children
  • Technology of the future:
    • Test facility for “LeitPilot”, autonomous station operation
    • Conversion into gondola lift for summer operation possible

“With the investment in two new, high-performance systems, we are not only marking the premiere of our cooperation with LEITNER, but are also focusing on the future of autonomous station operation for gondola lifts. We are firmly convinced that LeitPilot will have a significant impact on the industry.”

- Klaus Hofstätter, Managing Director of Hauser Kaibling Bergbahnen

A look into the future

The successful cooperation at Hauser Kaibling will continue as early as 2025 with the construction of the new GD10 “Senderbahn” – another highlight in the field of innovative ropeway technology, which we are very pleased to realize.

Suscripción alla newsletter

Las últimas noticias sobre nuestros proyectos y productos. ¡Regístrese ahora!