Skip to main content
Trust along the line
The mindset

Trust along
the line

Trust is built on reliability – day after day, journey after journey. For decades, LEITNER has been developing and manufacturing ropeways and transport solutions that operate worldwide under a wide range of climatic, topographical and operational conditions.

At LEITNER, development, production and service are closely integrated. This interplay, technical precision and experience gained from international projects make it possible to create installations that impress through operational reliability and consistent quality – predictable, efficient and available for the long term. Every design decision, every choice of material and every digital support tool follows one clear objective: reliable solutions all along the line.

Ropeway projects worldwide

Proven installations. Measurable performance.

Matterhorn Glacier Ride II

Zermatt – Switzerland – 2023

The Matterhorn Alpine Crossing is a unique, once-in a generation project which has created the highest border crossing in the Alps and connects two tourist destinations in Italy and Switzerland throughout the year. The construction of the new “Matterhorn Glacier Ride II” tricable gondola lift has closed the last remaining gap between Zermatt and Breuil-Cervinia, thus bringing to fruition a longheld vision. As well as its pioneering technical implementation, which includes bridging the distances between the top and bottom station on the “Matterhorn Glacier Ride II” without towers, much emphasis was placed on sustainability. For example, an additional photovoltaic system was commissioned on the facade of the new top station and will supply around 16,875 kWh of electricity each year. This project is unique in a number of ways. It involved pioneering work on the construction sites at extreme altitudes, as well as collaboration between two countries on a joint project which connects two tourism areas throughout the year.

TD28

Ropeway type

1.300

Throughput per hour

8,0 m/s

Speed

Pila Couis

Pila – Italy – 2025

In 2024, the Pila ski area in the Aosta Valley opened a brand-new 10-passenger gondola lift transporting passengers to the Stella di Pila panoramic restaurant in comfort while also serving as the first central hub for the direct link from Aosta to the highest points in the resort. The route opens up impressive views of prominent Alpine peaks such as Mont Blanc, the Matterhorn, Monte Rosa, Grivola and Gran Paradiso. The next phase of the development plan was completed in time for the current season, as the new “Pila-Couis” gondola lift commenced operation. The new ropeway is 2.3 kilometers in length, equipped with 67 cabins and reaches an operating speed of up to 6 m/s. Able to carry a maximum of 2,400 passengers per hour, it serves as a high-capacity and comfortable means of transport. The ropeway is configured to operate in both directions and has therefore been designed not only for winter sports fans but also with hikers and mountain bikers in mind – opening up access to a unique Alpine panorama all year round.

GD10

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Gifthittli

Zermatt – Switzerland – 2025

At Matterhorn Ski Paradise, a new 8-seater chairlift was realized to significantly improve the route from Riffelberg to Gifthittli. The ropeway reduces journey times, increases capacity and has been systematically designed to operate sustainably. Solar panels provide an additional source of energy generation, while the reuse of existing tower foundations and the installation of the gearless LEITNER DirectDrive reduces both energy consumption and noise levels. The route measuring more than 1.8 kilometers in length is served by 78 Premium Chairs EVO, which are equipped with individual footrests and protective hoods, offering a high level of ride comfort even in challenging weather conditions. The chairlift can transport up to 3,400 passengers per hour and provides significant relief for the highly frequented sections of the ski area. In addition to LEITNER DirectDrive, the ropeway also features the LeitControl control system and LeitPilot for autonomous station operation. Crafted in Pininfarina’s unmistakable Italian design language, the stations feature soaring roofs that blend seamlessly into the surrounding Alpine landscape.

CD8C

Ropeway type

3.400

Throughput per hour

6,0 m/s

Speed

Cablebús L2A + L2B

MEXICO CITY – Mexico – 2021

Equipped with more than 300 ten-passenger cabins, LEITNER’s “Cablebús 2” ropeway system carries up to 100,000 people per day over a distance of 10.6 kilometers via seven stations. The longest ropeway line in Latin America (Guinness World Record) opened on August 8, 2021. This ropeway is in the southeast of the Mexico City metropolitan area, in Iztalapala, whose 1.8 million residents can now enjoy significantly improved travel to workplaces, schools and recreational opportunities. More than 70,000 people are employed in stores, companies etc. along the route of the ropeway and can now reach their workplaces more quickly. There are also plans for 4,200 new jobs in Iztapalapa, which will be easier to get to thanks to this new mode of transport. And the travel time for this route has been greatly reduced from 75 to just 36 minutes. Residents of the district now enjoy not only a faster, safer connection, but also a much more sustainable means of transport.

GD10

Ropeway type

5.000

Throughput per hour

6,0 m/s

Speed

Kaiblinggrat

Haus – Austria – 2024

The 2024/25 winter season at Hauser Kaibling in Austria began with the new CD8C “Kaiblinggrat” from LEITNER, which replaces a 30-yearold chairlift. This modernization work is bringing a new generation of ropeway technology to the skiing area, offering greater comfort and more capacity. Since opening in December 2024, the system has been transporting up to 3,600 passengers per hour, making it the highest- capacity chairlift in Styria. With the main motor producing 704 kW of continuous power and the cabins moving at 6 m/s, the ropeway provides an enhanced visitor experience for winter sports fans. The 68 LEITNER Premium Chairs EVO carry passengers between the stations in just four and a half minutes, while a conveyor belt with lifting table makes it easy for children to board. The chairlift is also serving as a test bench for the innovative LeitPilot technology, which should allow the stations to operate autonomously in future. Another major plus point for the new system is the ability to convert it into a gondola lift for summer operations.

CD8C

Ropeway type

3.600

Throughput per hour

6,0 m/s

Speed

Valcigolera

San Martino di Castrozza – Italy – 2024

The San Martino di Castrozza skiing area, nestled in the Dolomites with breathtaking views of the Pale di San Martino, has commissioned a new 10-passenger gondola lift named “Valcigolera” to replace an old 2-seater chairlift. The ropeway connects the mountain hut of the same name with the Cima Tognola and shortens the journey to the summit, at just under 2,400 metres, from ten to three and a half minutes. The system is powered by renewable energy, making it particularly efficient. It is one of four LEITNER ropeways that have been installed in the skiing area in the past ten years. Up to 1,500 passengers per hour can be transported in modern cabins along the 1,300-meter route, which ascends 467 meters of altitude.

GD10

Ropeway type

1.500

Throughput per hour

6,0 m/s

Speed

Leading systems line-up

All ropeway systems

Applications

Designed for every environment

Alpine

Tourism

Material

Urban

International projects. Different tasks. One shared standard.

Diversity that creates perspectives

From the mountains to urban areas around the world, LEITNER ropeway technologies are used across a wide range of applications. This diversity is also reflected in the tasks that bring people from many different disciplines together every day.

In development, production, assembly and service, systems are created that combine technical expertise with practical experience. This international environment offers exciting challenges, wide-ranging development opportunities and the chance to play an active role in shaping projects.

 

Jobs

Your future gathers pace.
1,000+

Employees

20+

Locations worldwide

International

Environment

Reliability that connects generations

A partner for decades

Trust does not begin with the commissioning of an installation; it grows with every step taken together. From the initial idea through planning and implementation to service, modernisation and long-term operation, LEITNER supports its customers as a reliable partner throughout the entire lifecycle. Innovation is never an end in itself. Through continuous research, digital solutions and forward-looking technologies, we create lasting added value, increase availability and secure investments for the long term.

Our commitment does not end at handover. Global service expertise, fast response times and comprehensive lifecycle management ensure that installations can be operated efficiently, safely and economically for decades.

Trust along the line

Partnership across the entire life cycle

Shaping the future

Driving innovation forward

Safeguarding operation

Preserving value

Putting trust into practice

The new era of ropeways

With ROPERA®, LEITNER is rethinking ropeways for mountains and cities: pleasantly quiet in operation, designed with sustainability in mind and shaped by distinctive Pininfarina design. The system gives passengers a noticeably smoother journey to their destination and makes day-to-day work significantly more relaxed and safer for operation teams. All insights into the next generation of ropeways are available on the product page.
Learn more

News, Insights & Innovation

All stories, news & press releases

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

Research project in Mexico

13.10.2026

ROPERA® on track for success

09.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER moves people. Quietly. Seamlessly. Responsibly.