Skip to main content
Detachable chairlifts
Demanding operation. Maintenance-friendly solution.

Modular
solutions

Detachable chairlifts combine technical precision with high operational safety and efficient installation management. The maintenance-friendly design of all safety-critical assemblies ensures maximum reliability in daily operation. Thanks to the modular LEITNER system, individual configurations and subsequent extensions can be implemented with ease. Excellent ride comfort, capacity and cost-effectiveness make these chairlifts a future-proof solution for a wide range of applications.

Chairlifts in daily operation

A selection of references: proven solutions in real-world operation.

Bernhard Glück

Sand in Taufers – Italy – 2025

The Speikboden ski area in Valle Aurina reached an international milestone in ropeway technology in the shape of the 6-seater chairlift “Bernhard Glück”. The system is the first in the world to be built according to the new ROPERA® standard for monocable uni-directional ropeways. Replacing an existing 4-seater chairlift, it raises capacity, efficiency and comfort to an entirely new level. The high-tech chairlift with Pininfarina-designed stations is equipped with gearless LEITNER DirectDrive, which makes for particularly quiet, energy-efficient and low-maintenance operation. A total of 61 Premium Chairs EVO operate along the 1.2-kilometer route and are able to transport up to 2,400 passengers per hour, reducing waiting time and improving access to the main slopes considerably.

CD6C

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Randolins

St. Moriz – Switzerland – 2025

After 30 years of service, the 4-seater Randolins chairlift in the St. Moritz ski area underwent complete renewal. The new 6-seater chairlift “Randolins – Munt da San Murezzan” allows guests to travel in comfort both from the Paradiso and from the Trutz sides, thereby significantly improving access to this central area. With an operating speed of 6 m/s, the new system increases capacity to up to 2,400 passengers per hour, up from 1,500 previously, while ensuring the highest standards of capacity, efficiency, and operational safety. The ropeway is also equipped with LeitPilot for autonomous station operation. Despite involving the construction of an entirely new ropeway system, the project followed a resource-efficient and sustainable approach. As the existing infrastructure was in a good condition, 9 of the 15 tower foundations were able to be reused, while the others were reinforced where necessary.

CD6C

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Aiguille-Percée

Tignes – France – 2025

The French winter resort of Tignes took another important step forward in the modernization of its ropeway infrastructure with the new 6-seater chairlift “Aiguille Percée”. The LEITNER-realized system is equipped with energy-efficient LEITNER DirectDrive and increases capacity to up to 2,400 passengers per hour, reducing waiting time and improving access to the main slopes. The gearless drive unit is particularly quiet and resource-friendly, helping to enhance both operational safety and the quality of the ride. The chairlift climbs around 300 meters in altitude along its 1-kilometer route. Its 44 chairs run at an operating speed of up to 6 m/s and guarantee a seamless and steady flow of passengers. With its new ropeway, Tignes is making a clear commitment to future-oriented, high-performance and sustainable winter sports infrastructure in the French Alps.

CD6

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Kaiblinggrat

Haus – Austria – 2024

The 2024/25 winter season at Hauser Kaibling in Austria began with the new CD8C “Kaiblinggrat” from LEITNER, which replaces a 30-yearold chairlift. This modernization work is bringing a new generation of ropeway technology to the skiing area, offering greater comfort and more capacity. Since opening in December 2024, the system has been transporting up to 3,600 passengers per hour, making it the highest- capacity chairlift in Styria. With the main motor producing 704 kW of continuous power and the cabins moving at 6 m/s, the ropeway provides an enhanced visitor experience for winter sports fans. The 68 LEITNER Premium Chairs EVO carry passengers between the stations in just four and a half minutes, while a conveyor belt with lifting table makes it easy for children to board. The chairlift is also serving as a test bench for the innovative LeitPilot technology, which should allow the stations to operate autonomously in future. Another major plus point for the new system is the ability to convert it into a gondola lift for summer operations.

CD8C

Ropeway type

3.600

Throughput per hour

6,0 m/s

Speed

Kapauns

Zell am Ziller – Austria – 2022

The new CD8C Kapauns in the tourist region of Zillertal has replaced an old system built in 1993, and its extended route takes it right up to the top of the col. This has created a new link between Zell and Gerlos. The new routing has almost doubled the associated pistes to over 2.5 km, bringing some to above 2500 m in the process, and making them fully north-facing, which means excellent snow conditions right into the spring. This part of the Zillertal Arena, with its 147 km of slopes, has been made significantly more attractive by the new ropeway. With a journey time of around seven minutes, the new 8-seater chairlift carries up to 3000 people per hour along a route of nearly two kilometers. It incorporates not only the latest ropeway technology from LEITNER, but also, in collaboration with world-renowned architects Snøhetta, a strong architectural dimension. The new stations feature designs that are minimalist yet spectacular.

CD8C

Ropeway type

2.940

Throughput per hour

6,0 m/s

Speed

SODLISIA

COLFOSCO (BZ) – Italy – 2021

In Colfosco in Val Gardena, South Tyrol, a state-of-the-art 8-seater chairlift has replaced a 4-seater chairlift that was 30 years old. The “Sodlisia” ropeway, which is powered by a DirectDrive, has lockable safety bars, premium upholstery, and weather protection bubbles and significantly increases travel comfort in the ski area, which is part of the Sella Ronda. A new, premium, Pininfarina-designed station was built up on the mountain, while the bottom station of the system is integrated into a newly constructed building that includes underground garaging. With a length of 785 meters, the 8-seater chairlift can carry up to 3,600 people per hour.

CD8C

Ropeway type

3.600

Throughput per hour

5,0 m/s

Speed

Technical highlights of the installation

The key components at a glance

Chair

Line

Station

LeitControl

Drive

Garaging

Optional extensions

High-performance technology for optimal operation

Assistance

Spare parts

Digital management

LeitPilot®

Bike Transport

Our roots are in the mountains. Our outlook extends far beyond them.