Skip to main content
Compact connections in urban and tourism environments

Automated
solution

LEITNER inclined elevators are based on proven vertical elevator technology and are ideally suited to straight, short routes. Thanks to integrated automation, no operating personnel are required, enabling particularly efficient and straightforward operation. The system provides a safe and comfortable transport solution for a wide range of applications and stands out for its ease of use and reliability.

Inclined elevators in daily operation

A selection of references: proven solutions in practical operation

Predazzo

Predazzo – Italy – 2025

With the realization of this new inclined elevator, LEITNER has made a key contribution to the modernization of the famous ski jumping hill in Predazzo. The project formed part of the Olympic program for Milan-Cortina 2026 and was geared toward creating the best possible infrastructure for international competition and athlete training. The inclined elevator measures approximately 250 meters in length and links the landing slope with the top with two stops on the way at the coaches platform and the judges’ tower. The system guarantees efficient, safe and all-weather access to the important areas of the ski jumping hill. DEMACLENKO took the opportunity to upgrade the existing snowmaking system during the construction works. The end product is a fully revised ski jumping center that meets the exacting standards of professional competition while also taking long-term operation, efficiency and sustainability into account.

IE25

Ropeway type

200

Throughput per hour

Wisla

Zakopane – Poland – 2024

A new inclined elevator from LEITNER in Wisła, Poland, now provides a modern shuttle service to the famous ski jumping hill there. A special 3S cabin from the Symphony range was developed according to the highest standards in partnership with SIGMA for this important world cup venue. The 300-meter-long ropeway transports up to 40 passengers per trip. One particularly convenient feature is the automatic leveling, which makes for a smooth and comfortable ride. With this new project, LEITNER is playing its part in modernizing infrastructure in Wisła and strengthening the region’s appeal as both a world-class ski jumping venue and as a tourism destination. Thanks to the combination of state-of-the-art technology and carefully considered design, the new ropeway is a valuable addition to the renowned ski jumping center.

IE40

Ropeway type

300

Throughput per hour

TURKU

Turku – Finland – 2019

Finland’s oldest city is making a clear statement in urban development. The current development on the famous Kakolanmäki hill is creating new apartments, a hotel, restaurants and bars. In 2019 the new city district and former prison hill was given a transport connection to the surrounding area by a new inclined elevator by LEITNER ropeways. The “Turku” inclined elevator proved the ideal solution for the terrain. The system is just 132 meters long and can transport 480 passengers per hour, spanning a vertical distance of 30 meters. As inclined elevators use the same fundamental technology as vertical elevators, short, straight routes like those on Kakolanmäki are the perfect application for them.

IE30

Ropeway type

480

Throughput per hour

Piazzetta S. Stefano

Verona – Italy – 2016

The castle, which was built by Field Marshal Radetzky at the end of the 19th century on the site of the ancient church of San Pietro, has the potential to attract vast numbers of tourists. Among other things, this is due to the unique view of the city of Verona. Although an inclined elevator known as the “Funicolare di Castel San Pietro” was built on the site in 1941, it only ran until 1944. According to the specifications for the planning and construction of the new system, the elevator must be built along the historic route and an additional midway station providing access to the park and Archaeological Museum must also be constructed. No changes were to be made to the architectural features of the historical structures. The new inclined elevator makes San Pietro easier to access for visitors, boosting its attractiveness.

IE25

Ropeway type

300

Throughput per hour

Optional technology & extensions

Powerful functions for optimal operation

Support

Spare parts

Digital management

Trust along the line

Partnership across the entire life cycle

Shaping the future

Driving innovation forward

Safeguarding operation

Preserving value

Putting trust into practice

Born in the Alps. At home all over the world.